Project Details
Project: "CONSTRUCTION OF CULVERT OF REMATOS PLATANOREMA ON LC ATHYRON"
Place: LOCAL COMMUNITY ATHYRON MUNICIPALITY OF PELLAS, GREECE
Budget: 400.000€
Contractor: PYRAMIS SA
Place: LOCAL COMMUNITY ATHYRON MUNICIPALITY OF PELLAS, GREECE
Budget: 400.000€
Contractor: PYRAMIS SA
Project Overview
The project concerns the construction of twin box-culvert dimensions 6,0x4,0m each, according to the typical drainage plans of Egnatia Odos SA. The culvert bridged the stream at the deepest point, where before it was made Irish bridge. At the same time the culvert´s wing -walls were constructed as retaining walls to protect the access road. Finally, for the operational completion of the project, road works were carried out on both sides of the construction site with the construction of an asphalt layer of 6,50m width and 0,50m asphalt shoulders on both sides for the safety markings (total 7,50m). The access road was reconstructed to a length of approximately 100m.